Three Point Estimate
Enter optimistic, most likely, and pessimistic durations to get a PERT weighted average estimate with standard deviation and confidence ranges.
Single Task Estimate
Project Tasks
No tasks added yet.
Project Total (PERT)
95% confidence range
Enter O, M, P values and click Calculate
Results will appear here
Task Estimate
PERT Estimate
—
days
Std Dev (SD)
—
68% Low
—
68% High
—
Confidence Intervals
68%
—
90%
—
95%
—
Bars show range width relative to the pessimistic value.
Formula Breakdown
E = (O + 4M + P) / 6
—
SD = (P - O) / 6
—
Variance = SD²
—
Copied!
Summary
Enter optimistic, most likely, and pessimistic durations to get a PERT weighted average estimate with standard deviation and confidence ranges.
How it works
- Enter the optimistic duration — the best-case scenario if everything goes smoothly.
- Enter the most likely duration — your realistic day-to-day expectation.
- Enter the pessimistic duration — the worst case if major issues arise.
- The tool computes the PERT weighted average: (O + 4M + P) / 6.
- Standard deviation (P - O) / 6 is used to calculate confidence interval ranges.
- Add multiple tasks to sum up total project estimates with combined uncertainty.
Use cases
- Estimate software development sprints with realistic buffers.
- Plan construction or manufacturing project timelines.
- Produce risk-adjusted schedules for project proposals.
- Identify high-variance tasks that need extra risk mitigation.
- Compare optimistic vs. pessimistic scenarios for stakeholder presentations.
- Aggregate multi-task estimates into a total project duration range.
- Support agile story-point planning with time-based equivalents.
- Teach project management estimation concepts in training workshops.