Three Point Estimate

Enter optimistic, most likely, and pessimistic durations to get a PERT weighted average estimate with standard deviation and confidence ranges.

Single Task Estimate

Project Tasks

No tasks added yet.

Enter O, M, P values and click Calculate

Results will appear here

Copied!

Summary

Enter optimistic, most likely, and pessimistic durations to get a PERT weighted average estimate with standard deviation and confidence ranges.

How it works

  1. Enter the optimistic duration — the best-case scenario if everything goes smoothly.
  2. Enter the most likely duration — your realistic day-to-day expectation.
  3. Enter the pessimistic duration — the worst case if major issues arise.
  4. The tool computes the PERT weighted average: (O + 4M + P) / 6.
  5. Standard deviation (P - O) / 6 is used to calculate confidence interval ranges.
  6. Add multiple tasks to sum up total project estimates with combined uncertainty.