Cricket Run Rate Calculator
Enter the score and overs to get the current run rate, plus the required run rate to reach a target.
Match Score
Overs use X.Y notation, where Y is balls faced (0–5). 6.3 = 6 overs and 3 balls.
Optional — for required run rate
Quick Examples
Enter a score and overs on the left to see the run rate
—
Current Run Rate
—
Required Run Rate
—
True Overs Faced
Run Rate Formulas
CRR = Runs ÷ True Overs Faced
RRR = (Target − Runs) ÷ True Overs Remaining
True overs convert the X.Y scorecard notation into a decimal: the balls part is out of 6, not 10. For example, 6.3 overs is 6 + 3⁄6 = 6.5 true overs.
Copied!
Summary
Enter the score and overs to get the current run rate, plus the required run rate to reach a target.
How it works
- Enter the current score and overs completed, using X.Y notation where Y is balls (0–5), e.g. 6.3 for 6 overs and 3 balls.
- The calculator converts overs to true decimal overs (6.3 becomes 6.5, since 3 balls is half an over).
- Current run rate = total runs divided by true decimal overs.
- Add a target score and the match's total overs to also get the required run rate.
- Required run rate = runs still needed divided by the true decimal overs remaining.
- A projected score at the current run rate is shown when the total overs are known.
Use cases
- Check a team's scoring pace mid-innings.
- Work out the required run rate for a run chase in a T20 or ODI match.
- Compare current run rate against required run rate to gauge chances of winning.
- Plan a batting approach for the overs remaining.
- Follow along with a live scorecard and verify the broadcast run rate.
- Estimate a projected final score if the current pace holds.
Frequently Asked Questions
Last updated: 2026-07-23 ·
Reviewed by Nham Vu