Cricket Run Rate Calculator

Enter the score and overs to get the current run rate, plus the required run rate to reach a target.

Match Score

Overs use X.Y notation, where Y is balls faced (0–5). 6.3 = 6 overs and 3 balls.

Optional — for required run rate

Quick Examples

Enter a score and overs on the left to see the run rate

Run Rate Formulas

CRR = Runs ÷ True Overs Faced
RRR = (Target − Runs) ÷ True Overs Remaining

True overs convert the X.Y scorecard notation into a decimal: the balls part is out of 6, not 10. For example, 6.3 overs is 6 + 3⁄6 = 6.5 true overs.

Copied!

Summary

Enter the score and overs to get the current run rate, plus the required run rate to reach a target.

How it works

  1. Enter the current score and overs completed, using X.Y notation where Y is balls (0–5), e.g. 6.3 for 6 overs and 3 balls.
  2. The calculator converts overs to true decimal overs (6.3 becomes 6.5, since 3 balls is half an over).
  3. Current run rate = total runs divided by true decimal overs.
  4. Add a target score and the match's total overs to also get the required run rate.
  5. Required run rate = runs still needed divided by the true decimal overs remaining.
  6. A projected score at the current run rate is shown when the total overs are known.

Use cases

  • Check a team's scoring pace mid-innings.
  • Work out the required run rate for a run chase in a T20 or ODI match.
  • Compare current run rate against required run rate to gauge chances of winning.
  • Plan a batting approach for the overs remaining.
  • Follow along with a live scorecard and verify the broadcast run rate.
  • Estimate a projected final score if the current pace holds.

Frequently Asked Questions

Last updated: 2026-07-23 · Reviewed by Nham Vu