Cp Process Capability Ratio Calculator
Calculate Cp and Cpk process capability ratios from specification limits and standard deviation to see how well a process fits within tolerance.
Use the Cp Process Capability Ratio Calculator
Process Parameters
Average of measured output values.
Must be greater than zero.
Enter specification limits, mean, and sigma to calculate Cp and Cpk.
Cp (Potential)
—
centered process
Cpk (Actual)
—
accounting for centering
Capability Classification
—
—
Process Spread vs. Tolerance Band
—
6σ spread / tolerance
LSL
USL
Detailed Metrics
Tolerance band (USL − LSL)
—
Process spread (6σ)
—
% of tolerance used
—
CPU (upper capability)
—
CPL (lower capability)
—
Mean offset from center
—
Cp / Cpk Interpretation Guide
Cp / Cpk < 1.00
Not capable — produces defects
1.00 ≤ Cp / Cpk < 1.33
Marginal — monitor closely
1.33 ≤ Cp / Cpk < 1.67
Capable — meets most standards
Cp / Cpk ≥ 1.67
Excellent — high confidence
Cpk drives the classification. A high Cp with a low Cpk signals an off-center process that needs mean adjustment.
Summary
Calculate Cp and Cpk process capability ratios from specification limits and standard deviation to see how well a process fits within tolerance.
How it works
- Enter the Upper Specification Limit (USL) and Lower Specification Limit (LSL).
- Enter the process mean (average measured output value).
- Enter the process standard deviation (sigma).
- Cp = (USL − LSL) / (6 × sigma) — measures potential capability assuming a centered process.
- Cpk = min((USL − mean) / (3 × sigma), (mean − LSL) / (3 × sigma)) — measures actual capability accounting for centering.
- Results show both indices, tolerance used, process spread, and a classification from not capable to excellent.
Use cases
- Assess whether a machining process can hold tight dimensional tolerances.
- Compare capability before and after a process improvement project.
- Identify off-center processes where Cpk is much lower than Cp.
- Set sigma targets to achieve a desired Cp of 1.33 or 1.67.
- Support PPAP (Production Part Approval Process) submissions with Cp/Cpk data.
- Train quality engineers on the difference between potential and actual capability.
Frequently Asked Questions
Last updated: 2026-09-20 ·
Reviewed by Nham Vu