Packed Tower Calculator

Compute HTU, NTU, and required packing height for gas absorption or liquid stripping packed towers.

Tower Parameters

Key Component Compositions (mole fraction)

Flow Rates (any consistent molar units)

Packing Data

From vendor data or mass-transfer correlation

Results

Fill in parameters and click Calculate

Summary

Compute HTU, NTU, and required packing height for gas absorption or liquid stripping packed towers.

How it works

  1. Select the operation type: absorption (gas into liquid) or stripping (liquid into gas).
  2. Enter the inlet and outlet mole fractions or concentrations for the key component.
  3. Provide the gas and liquid flow rates and the equilibrium constant (m = y*/x).
  4. The calculator computes the operating line slope (L/G ratio), then integrates numerically to find NTU.
  5. Enter your HTU (from mass-transfer correlations or vendor data) to get total packing height.

Use cases

  • Size packing height for a new gas absorption column.
  • Back-calculate NTU from an existing column to evaluate performance.
  • Compare HTU values from different packing vendors.
  • Estimate stripper height for VOC removal from process water.
  • Verify hand-calculated NTU results during design reviews.
  • Screen feasibility of absorption vs. adsorption for a given separation.

Frequently Asked Questions

Last updated: 2026-06-11 · Reviewed by Nham Vu