Haul Cycle Time Calculator
Enter haul distance, speed, grade, payload, spot and load time, and dump time to calculate truck cycle time, fleet productivity, trucks needed, and utilization.
Use the Haul Cycle Time Calculator
Truck & Route Parameters
Each 1% uphill grade reduces effective speed by ~3% on the affected leg.
Fleet Sizing
Enter parameters and click Calculate
Cycle Time Breakdown
Total Cycle Time
Trips / truck / hr
Tonnes / truck / hr
Trucks required
Fleet utilization
Fleet Production Summary
| Metric | Value |
|---|
Summary
Enter haul distance, speed, grade, payload, spot and load time, and dump time to calculate truck cycle time, fleet productivity, trucks needed, and utilization.
How it works
- Enter the one-way haul distance (metres) from the loading point to the dump.
- Set the average loaded haul speed (km/h) and the average empty return speed (km/h).
- Enter the road grade (%) — positive for uphill loaded, negative for downhill loaded. The grade penalty is applied automatically to loaded and return legs.
- Enter combined spot and loading time (minutes) at the shovel and dump time (minutes) at the tip.
- Enter truck payload (tonnes) and the target production rate (tonnes/hour) for fleet sizing.
- Click Calculate to see cycle time, single-truck productivity, trucks required, and fleet utilization.
Use cases
- Estimate how many haul trucks are needed to hit a target ROM production rate.
- Compare productivity impact of shortening haul distance versus upgrading to faster trucks.
- Evaluate the effect of road grade on cycle time and fleet size requirements.
- Benchmark modelled cycle times against actual GPS dispatch data.
- Plan equipment requirements for a new open-pit or quarry operation.
- Assess the productivity loss caused by increasing dump wait time during high-traffic periods.