Haul Cycle Time Calculator
Enter haul distance, speed, grade, payload, spot time, and dump time to calculate truck cycle time, fleet productivity, trucks needed, and utilization.
Truck & Route Parameters
Each 1% uphill grade reduces effective speed by ~3% on the affected leg.
Fleet Sizing
Enter parameters and click Calculate
Cycle Time Breakdown
Total Cycle Time
Trips / truck / hr
Tonnes / truck / hr
Trucks required
Fleet utilization
Fleet Production Summary
| Metric | Value |
|---|
Summary
Enter haul distance, speed, grade, payload, spot time, and dump time to calculate truck cycle time, fleet productivity, trucks needed, and utilization.
How it works
- Enter the one-way haul distance (metres) from the loading point to the dump.
- Set the average loaded haul speed (km/h) and the average empty return speed (km/h).
- Enter the road grade (%) — positive for uphill loaded, negative for downhill loaded. The grade penalty is applied automatically to loaded and return legs.
- Enter spot time (minutes) at the shovel and dump time (minutes) at the tip.
- Enter truck payload (tonnes) and the target production rate (tonnes/hour) for fleet sizing.
- Click Calculate to see cycle time, single-truck productivity, trucks required, and fleet utilization.
Use cases
- Estimate how many haul trucks are needed to hit a target ROM production rate.
- Compare productivity impact of shortening haul distance versus upgrading to faster trucks.
- Evaluate the effect of road grade on cycle time and fleet size requirements.
- Benchmark modelled cycle times against actual GPS dispatch data.
- Plan equipment requirements for a new open-pit or quarry operation.
- Assess the productivity loss caused by increasing dump wait time during high-traffic periods.